INITIAL FUNDING REQUEST OF 2,000,000.00 OF REMEDIAL FUNDS FOR TASK ORDER 68HE0226F0017 FOR DEMOLITION WORK AT THE BATTERY RECYCLING COMPANY RA SITE, SSC TASK #1, IN ARECIBO, PR 00612-3560, SITE ID: 02ZS.
PROVIDE MITIGATION CONTRACTING ACTIVITIES AT THE FORMER SAN FRANCISCO CLEANERS SITE, IN SAN JUAN, PR 00907-1559 UNDER SITE ID A2B5 FOR THE INSTALLATION OF VAPOR INTRUSION SYSTEMS INCLUDING AS-BUILT DRAWINGS, WORK, MAINTENANCE AND HEALTH AND SAFETY PL
PROVIDE MITIGATION ACTIVITIES AT THE GUAYANILLA BAY PR-127 SITE IN GUAYANILLA BAY, PR, SITE ID Z2CW, TO MITIGATE THE THREATS FROM AN ONGOING RELEASE OF OIL CONTAMINATED WATER AND SOIL WHICH IS PENETRATING A DRAINAGE PIPE AND RELEASING INTO A NAVIGABL
DORADO GROUNDWATER CONTAMINATION SUPERFUND SITE INVESTIGATION - OPERABLE UNIT 1 (OU1) OF THE DORADO GROUNDWATER SUPERFUND SITE (SSID A25N) RA/LTRA TASK ORDER UNDER THE ESO SUITE OF CONTRACTS. THIS SITE IS BIL FUNDED. SSC TASK 1 NOTE: THIS PR IS
START V BASE TASK ORDER: CORE RESPONSE TEAM FOR CONTRACT YEAR 5 IN ACCORDANCE WITH STATEMENT OF WORK FOR THE PERIOD JULY 1, 2023 THROUGH JUNE 30, 2024.
REPA 6 TASK ORDER AWARD FOR HYDROGEOLOGICAL, CORRECTIVE ACTION AND PERMIT SUPPORT FOR CARIBBEAN ENVIRONMENTAL PROTECTION DIVISION (CEPD) AND LAND CHEMICALS AND REDEVELOPMENT DIVISION (LCRD) SOLICITATION: 68HE0223R0008 POP: THROUGH END OF CONTRACT 1
RCRA ENFORCEMENT AND PERMITTING ASSISTANCE (REPA) 7 CONTRACT, TO ASSIST EPA AND THE STATES IN IMPLEMENTING THE RCRA PROGRAM. TASK ORDER AWARD: PREPARATION OF SAMPLING AND ANALYSIS PLANS (SAPS) FOR SITE ASSESSMENTS (SOIL AND GROUNDWATER SAMPLING)
COMMIT $475,000 TO ER, FOR SECURITY SERVICES AT THE PUERTO RICO BATTERY RECYCLING SITE. CONTRACT # 68HE0220D0001, TO TBD, SITE ID # 02ZS. THIS IS A REMEDIAL FUNDED TASK ORDER
START V BASE TASK ORDER TO SUPPLEMENT THE CORE RESPONSE TEAM FOR CONTRACT YEAR 4 TO PROVIDE DATA VALIDATION SERVICES OF SAMPLES FOR THE OCHOA FERTILIZER SITE.
THE PURPOSE OF THIS REQUIREMENT AND THE STATEMENT OF WORK (SOW) IS TO PROPERLY CONDUCT LONG-TERM REMEDIAL ACTION (LTRA) ACTIVITIES AT THE COROZAL WELL SITE. THIS INCLUDES THE FOLLOWING: -PERFORMANCE OF THE LONG-TERM MONITORING PLAN (LTMP), -GROUNDW