THE PURPOSE OF THIS CONTRACT ACTION IS TO PROCURE THE SERVICES OF CONSTRUCTION INSPECTION (CI-LV II AND POE) FOR PROJECT PR ER DOT PRMNT RPR(25) - PUERTO RICO HIGHWAY AND TRANSPORTATION AUTHORITY FOR LANDSLIDE REPAIRS IN THE WEST REGION C1. THIS ACTI
PROJECT PR ER DOT PRMNT RPR(23): THE PROJECT CONSISTS OF REPAIRING LANDSLIDES AND WASHOUTS DAMAGES CAUSED BY HURRICANES IRMA AND MARIA ON PR-1 KM. 111.6 - 111.8 (HWY-3), PR-1 KM. 24.8 (HWY-4), PR-10 KM. 52.3 (HWY-11), PR-10, KM. 30.3-30.4 (HWY-12)
THIS IS A REQUEST FOR PROPOSAL (DESIGN BUILD) PROJECT NO. PR ER PRMNT RPR(1), LOCATED IN THE MUNICIPALITY OF CANOVANAS, PUERTO RICO, IS IN STRICT ACCORDANCE WITH THE SOLICITATION/CONTRACT INSTRUCTIONS, NOTICES, CLAUSES, PROVISIONS, ITEMS LISTED BELOW
PROJECT PR ER DOT PRMNT RPR(27) THE PROJECT CONSISTS OF REPAIRING SIGNS, GUARDRAILS, AND OTHER MISCELLANEOUS DAMAGES CAUSED BY HURRICANES IRMA AND MARIA IN THE METRO, NORTH, AND SOUTH REGIONS. THE WORK INCLUDES TRAFFIC SIGN ASSEMBLIES (SMALL SIGNS,
PR ER DOT PRMNT RPR(16) THE PROJECT CONSISTS OF REPAIRING SIGNS, GUARDRAILS, AND OTHER MISCELLANEOUS DAMAGES CAUSED BY HURRICANES IRMA AND MARIA IN THE WEST REGION. THE WORK INCLUDES TRAFFIC SIGN ASSEMBLIES (SMALL SIGNS, GROUND MOUNTED, OVERHEAD),
REPLACE EXISTING UNDERGROUND UTILITIES ON PROPERTY INCLUDING DOMESTIC WATER, FIRE WATER, FIRE HYDRANTS, AND ASSOCIATED BACKFLOW PREVENTERS, SANITARY SEWER AND ASSOCIATED MANHOLE STRUCTURES, STORM DRAINAGE AND MANHOLE STRUCTURES. REPLACE FIRE PUMP HOU
PROJECT PR ER DOT PRMNT RPR(25) THE PROJECT CONSISTS OF REPAIRING LANDSLIDES AND WASHOUTS DAMAGES CAUSED BY HURRICANES IRMA AND MARIA ON PR-108, KM. 16.9 (HWY-21), PR-120, KM. 27.5 (HWY-80), PR-124, KM. 2.4 (HWY-105), PR-339, KM. 1.7-1.8 (HWY-347)
THE PURPOSE OF THIS PURCHASE ORDER IS TO LEASE ADDITIONAL TEMPORARY COMMERCIAL OFFICE SPACE IN SAN JUAN, PUERTO RICO FOR THE FTA REGION IV, PUERTO RICO TEAM.
PROJECT PR ER DOT PRMNT RPR(17) THE PROJECT CONSISTS OF REPAIRING LANDSLIDES AND WASHOUTS CAUSED BY HURRICANES IRMA AND MARIA ON PR-155 (KM: 37, 39.10, 40.30, 43, 43.25, 56.70, 45.50, 35, 36.15, 38.35), AND ON PR-159 (KM: 3.20, 3.50). THE WORK INCLU