IGF::OT::IGF - THE WORK INVOLVES ARCHITECT / ENGINEER (A/E) SERVICES FOR THE DESIGN AND CONSTRUCTION ADMINISTRATION OF A STORM WATER MITIGATION PROJECT AT THE ARECIBO JOB CORPS CENTER. THE PROJECT WILL PERTAIN TO THE ENTIRE SITE, WHICH TOTALS 11.4 ACRES AND WILL COMPRISE CIVIL IMPROVEMENTS TO CONTROL AND MINIMIZE THE STORM WATER FLOWS AND AVOID FLOODING EVENTS AROUND THE LOWER CAMPUS OF THE SITE. THE DESIGN EFFORT WILL BE BASED ON AN EXISTING 2002 HYDROLOGIC STUDY (HS), ENCLOSED HEREIN IN ATTACHMENT 3. AN UPDATED AND REVISED HS IS PART OF THIS SCOPE OF WORK AND WILL REFLECT THE CURRENT CONDITIONS AT THE CENTER. THE UPDATED STUDY SHALL RE-EVALUATE THE PROPOSED OPTIONS OF THE ORIGINAL AGAINST CURRENT CONDITIONS, AND UPDATE THEM ACCORDINGLY. THE A/E CONTRACTOR SHALL DEVELOP TWO ALTERNATIVE DESIGN OPTIONS AND PRESENT THEM TO DOL FOR REVIEW, AND DEVELOP THE OPTION SELECTED BY DOL. THE DESIGN OPTIONS SHALL BE PRESENTED IN A PRELIMINARY SUBMISSION WHICH SHALL CONSIST OF A DETAILED NARRATIVE AND ANALYSIS OF THE OPTIONS, AND A FULLY BROKEN DOWN COST ESTIMATE FOR EACH.